Baldocer Heat Recovery
LOCATION
Baldocer production plant – Villafamés, Castellón (Spain)
Objective:
Design and implement a waste heat recovery system from the kiln to the horizontal press dryers, in order to reduce gas consumption and improve energy efficiency in the ceramic drying process.
Technical Project Description
In this installation, a custom system was designed to capture the residual hot air expelled by the kiln (at over 240°C) and redirect it to the dryers, thus utilizing an energy source that was previously wasted.
This heat recovery has been one of the most complex due to the long distance between the kiln and the horizontal dryers. Nevertheless, complete integration was achieved without interrupting regular production.
System Components:
Air capture from the kiln cooling chimney using a supply fan.
Distribution to the dryers through air recirculation ducts, before the burner.
Complete automation of the system, with valve and parameter control via touch screen and programmable logic controllers.
How Are Savings Generated?
The system injects preheated air directly into the dryer circuit, which reduces the burner’s workload. Since the air already arrives at a higher temperature, less gas is needed to reach the target temperature, resulting in energy savings of up to 60% in the dryers.
Results Achieved
- Up to 60% gas savings in horizontal dryers.
- Reduction of the plant’s energy footprint.
- Improvement of drying system efficiency.
- Project compatible with obtaining Energy Savings Certificates (CAEs).
Applied Innovation
This project integrates advanced heat recovery technical solutions already successfully applied in other ceramic installations. However, in Baldocer’s case, the adaptation to a particularly complex configuration demonstrates the system’s ability to adjust to the specific characteristics of each plant.